Northwestern University, Ryan Field

Design, Financial Modeling, Procurement, Construction Administration
LED Display Systems (Primary, Auxiliary, Ribbon Board), Content Management System, Scoring, Broadcast Control Room, Scoreboard Camera Platforms

PROJECT HIGHLIGHTS

Anthony James Partners (AJP) served as Technology Consultant for Northwestern University’s $850 million redevelopment of Ryan Field, leading the planning, design, procurement and implementation oversight of the stadium’s broadcast production and LED display systems.

AJP worked with Northwestern and the project team, including Ryan Sports Development, Eleven Project Management, Thornton Tomasetti, CAA ICON, HNTB, Perkins&Will, Turner Construction Company and Walsh Construction, from the early stages of stadium technology planning. AJP developed the broadcast and LED systems while coordinating the architectural, structural, infrastructure and building requirements necessary to integrate the technology throughout the venue.

The project continues AJP’s longstanding work with Northwestern Athletics. In 2014, AJP designed and managed the implementation of the LED display system at the original Ryan Field, and the firm returned as Technology Consultant for the complete redevelopment of the stadium.

BROADCAST PRODUCTION SYSTEM

At the center of the broadcast program is a 1080p / 3G production control room, designed alongside the camera systems, broadcast positions and supporting technology infrastructure to support game-day production throughout Ryan Field.

The production environment incorporates Grass Valley cameras and production switching, Evertz routing and replay technology, Ross Video display control and graphics integration, and a comprehensive wireless camera system. The production system was developed not only for Ryan Field operations, but with the ability to support broader production and videoboard operations across Northwestern Athletics over time.

ZTransform was awarded the broadcast systems integration package.

LED DISPLAY PROGRAM

AJP designed and managed the procurement of the stadium’s comprehensive LED display program, beginning with extensive modeling, placement studies and sightline analysis to integrate the displays into the architecture of the venue.

The program includes more than 7,000 square feet of LED video technology, anchored by two 45-foot-high by 100-foot-wide, 8 mm end-zone displays. More than 2,400 linear feet of LED ribbon extends throughout the stadium, including a nearly 1,200-foot mid-bowl display that follows the upper concourse and an additional 1,270 linear feet of ribbon displays.

Additional displays include a 1.2 mm outdoor LED display measuring approximately 9 feet high by 24 feet wide in the North Great Hall, along with multiple displays integrated into the stadium vomitories. The overall video package also includes approximately 275 indoor and outdoor televisions and 50 play clocks and locker room clocks.

AJP worked with the project team from early concept development through detailed design and procurement, evaluating display dimensions, viewing angles, content presentation and integration with broadcast and game-production operations. The work also required detailed coordination of display locations, mounting and support conditions, concrete embeds, guardrails, MEP requirements and other interfaces between the technology systems and the building.

SNA Displays was awarded the LED display package.

INTEGRATED TECHNOLOGY DESIGN

Rather than approaching the videoboards and broadcast control room as independent systems, the Ryan Field technology program was developed around the relationship between the venue’s production infrastructure and the displays it drives.

The control room, camera systems and LED display infrastructure were designed together to support live game presentation, in-venue content and broadcast production while providing the flexibility for Northwestern Athletics to expand its production model over time.

AJP also led the competitive procurement process for the Ryan Field technology systems, developing technical specifications, managing vendor proposals and interviews, and supporting Northwestern through final selection and implementation.

The Ryan Field project is one component of AJP’s broader technology work with Northwestern Athletics. AJP has also worked with the University to evaluate its existing broadcast infrastructure and develop a long-term technology roadmap addressing production needs across multiple athletic venues.

“We’re grateful to Pat Ryan (Ryan Sports Development), Kacie Renc (Eleven Project Management), and everyone at Northwestern for including us in such an important project for a historic program,” said Michael Rowe, CEO of Anthony James Partners. “It’s great to see a collegiate venue leading rather than following what professional stadiums are doing. They took a different approach from the beginning. Pat was personally engaged in the technology decisions, did the research and challenged the team to think beyond what had traditionally been done at the collegiate level. They bucked trends, thought outside the box and were committed to delivering a professional stadium experience. The result is one of the best display and production environments in collegiate sports.

“I think Ryan Field will establish a new benchmark and have an impact on both the collegiate and professional markets. We also appreciate being welcomed as part of the team, collaborating with Thornton Tomasetti, CAA ICON, HNTB, Perkins&Will, Turner Construction Company, Walsh Construction and the entire team that helped bring it together.”

in the news

Northwestern University Taps Grass Valley for Control Room Tech at Ryan Field

Northwestern University has deployed Grass Valley production switching and camera technology at its new Ryan Field stadium in Evanston, Illinois. The installation equips the stadium’s broadcast control room with a K-Frame VXPE production switcher, Kayenne control panel and five LDX 100 Series cameras, supporting live coverage of Wildcats football and other events.

The project forms part of the university’s $875 million investment in the new 35,000-seat Ryan Field, which opened on October 2, 2026, when Northwestern hosted Penn State in a nationally televised football game. Made possible in large part by the vision and generosity of the Patrick and Shirley Ryan family, the stadium represents a major investment in the future of Northwestern athletics. Pat Ryan Jr., who led the project through Ryan Sports Development, played a key role in bringing the new venue to life. Working with broadcast technology consultant Anthony James Partners (AJP), Northwestern selected Grass Valley technology to meet the production requirements of the new venue, with support for 1080p, UHD and HDR workflows.

A private research university based just north of Chicago, Northwestern competes in the Big Ten Conference. Its athletics department produces live event coverage and in-venue content, with students working alongside professional production staff. The proximity of the Big Ten Network’s Chicago broadcast facility, which also uses Grass Valley technology, was an important consideration in the equipment selection.

“Ryan Field is a major investment for Northwestern, and we wanted production technology that reflected the ambitions of the new stadium,” says Luke Roberson, Director of Broadcast Operations, Live Events, Northwestern University. “We needed a reliable, high-performance system that our staff and students could operate confidently, with the flexibility to handle different types of live coverage. The Grass Valley equipment gives us those capabilities while maintaining continuity with the technology used by the Big Ten Network.”

Professional Production for a New Field of Dreams

The Ryan Field control room uses a Grass Valley K-Frame VXPE production switcher with a Kayenne 3 M/E control panel. The compact K-Frame system provides 40 inputs and 20 outputs, internal multiviewing and support for 12G UHD production, giving Northwestern the switching capabilities used in professional broadcast environments.

The camera installation comprises three LDX 150 cameras and one LDX 135 for fixed game coverage, together with a wireless LDX 135 for roaming and sideline positions. Two of the LDX 150 cameras are equipped with adapters for 80x box lenses, supporting long-range coverage from elevated positions. The wireless camera gives production teams additional flexibility to capture action around the field.

Four XCU Xpress UXF base stations connect the cabled cameras, with IP and 12G SDI connectivity options. Five Grass Valley Creative Grading panels and a CCS-ONE camera control server provide camera shading and color management across the system. The common LDX camera platform also simplifies operation and training for crews working across different camera positions.

“For a stadium production environment, the choice of cameras and switching technology has a direct impact on what the crew can deliver during a live event,” says Michael Martin, VP of Technology, Anthony James Partners. “The LDX 150 and LDX 135 combination gives Northwestern the coverage options it needs, including long-lens and wireless positions, while the K-Frame VXPE provides professional switching capabilities in a compact system. Creative Grading also makes camera control more accessible for staff and student operators.”

Another Milestone Deployment for University Sports Productions

Installation began in spring 2026 and was completed during the summer, with the production system ready for the stadium’s October debut. The project formed part of a wider construction program operating to a demanding opening schedule, with the new control room successfully supporting its first live event.

The new control room provides Northwestern with professional broadcast capabilities for its stadium productions, with staff and students working alongside one another on live events. The university is also considering adding a second control room as its production requirements develop.

“Northwestern is an important new customer for Grass Valley, and we’re proud to have played a part in bringing the new Ryan Field to life,” says Greg Doggett, Vice President of Sports Sales, North America, Grass Valley. “Having our production technology ready for the stadium’s opening game was a significant milestone. It’s another successful deployment in collegiate sports and reflects the investment universities are making in professional production facilities.”

RELATED PROJECTS